Go / No-Go Feasibility Assessment
Evaluated against your active Company Capability Vault
Drop any SAM.gov notice link or multi-document RFP bundle. GovCraft strips 70% of repetitive FAR clauses, flags hidden Section L/M disqualification traps, and exports a cross-referenced Excel Matrix (.xlsx) and tailored Word Technical Volume (.docx).
Drag the X-Ray divider across the solicitation below. Watch how unstructured SAM.gov legalese and conflicting SF-30 Amendments are instantly distilled into structured Shipley matrices and Section-L compliant narrative.
Maps to Factor 1, Subfactor 1A → Volume I, Section 2.1. Cites USAF AMC Past Performance Contract FA4452-23-C-0019 ($3.8M).
Base RFP demanded Top Secret FCL; Amendment 0001 Item 2 relaxed requirement to Secret FCL. Offeror CAGE 9A7X4 qualifies as Prime.
Zero-Hallucination Safeguard inserted: [HUMAN INPUT REQUIRED: Specify your drift detection tool for PWS C.3.1.3]
SECTION C - PERFORMANCE WORK STATEMENT (PWS) // PAGE 47 OF 148
C.3.1.2 The Contractor shall migrate a minimum of thirty-five (35) Tier-1 and Tier-2 legacy mission applications from on-premises data centers to the target cloud enclave within 120 calendar days [NOTE: SEE SF-30 AMENDMENT 0001 REDUCING TIMELINE TO 90 CALENDAR DAYS] of contract award with less than two (2) hours of scheduled cutover downtime...
SECTION I - CONTRACT CLAUSES INCORPORATED BY REFERENCE: FAR 52.202-1 Definitions; FAR 52.203-3 Gratuities; FAR 52.204-7 System for Award Management; FAR 52.212-4 Contract Terms and Conditions; DFARS 252.204-7012 Safeguarding Covered Defense Information...
C.4.2 The Contractor must maintain an active Top Secret Facility Clearance (FCL) [SUPERSEDED BY AMENDMENT 0001 ITEM 2: SECRET FCL REQUIRED] at the time of proposal submission...
Generic AI chatbots fail on federal procurements because they choke on 150-page context windows and invent capabilities. GovCraft is a purpose-built deterministic + neural pipeline.
Up to two-thirds of a federal solicitation consists of verbatim Section I and Section K FAR/DFARS boilerplate. Our pre-processor catalogs clause numbers while isolating Sections C (PWS), L (Instructions), and M (Evaluation Criteria)—eliminating context dilution.
Contractors get disqualified every week for following a page limit or deadline that was modified in Amendment 0002. GovCraft reconciles amendments chronologically.
Source Selection Evaluation Boards penalize generic prose. Where a PWS requirement demands a specific metric not found in your Vault, GovCraft inserts a highlighted review tag.
All VPCs are provisioned via modular Terraform IaC with continuous drift detection via [HUMAN INPUT REQUIRED: Specify drift tool].
Proposal Managers track compliance in Microsoft Excel and write technical volumes in Microsoft Word. One click compiles both native OpenXML deliverables plus a Contracting Officer RFI log.
Enterprise GovCon platforms lock small businesses into $18,000/year contracts. Start with a single solicitation pass or subscribe monthly via Lemon Squeezy.
For an urgent solicitation deadline this week.
For active SDVOSB, WOSB & 8(a) teams bidding monthly.
For high-velocity capture teams & proposal consultants.